Refer to EC “Mandate to CEPT to develop least restrictive harmonised technical conditions suitable for next-generation (5G) terrestrial wireless systems for priority frequency bands above 24 GHz” regarding Tasks 1, 2 and 4
Deliverables:
- March 2021 : draft for public consultation
- July 2021: final report
ECC #55 tasked ECC PT1 to study coexistence at the 40.5 GHz boundary between MFCN in 40.5-43.5 GHz and uncoordinated satellite earth stations in 39.5-40.5 GHz:
ECC(21)027 Annex 07