European Communcations Office

ECC Work Programme Database

   
Work Item details
Reference FM44_43
Short Name Revision and possible merge of ERC Decisions (99)05 and (99)06
ETSI Workitem
ETSI Deliverable
Subject Revision of the CEPT regulatory framework for S-PCS < 1GHz

Related WI
Scope

Some modifications of the ERC Decisions (99)05 and(99)06 are needed to align the process with current ECC rules of procedure.

The ERC Decisions (99)05 and (99)06 will be revised with the following items:

-        Possible merge ECTRA/DEC/(99)02, ERC/DEC/(99)05 and ERC/DEC/(99)06 Decisions;

-        Consider umbrella application term “MSS earth stations” (layer 2 term in Annex 2 of ECC Decision (01)03) in addition to S-PCS;

-        Possibility of streamlining or speed up the processes in the ERC Decision (99)06, including possibility of merging related decisions;

-        Study the possible conflicts and duplications with the ITU process;

-        Review enforcement of the constraints for operators;

-        Means of compliance with milestone 7;

-        Reconsider need for intra-MSS study results as a requirement for inclusion in Annex 2.Technical parameters should define reliable spectrum access in a shared spectrum environment used by several MSS operators;

-        The procedure(ex: need for public consultation) and number of supporting administrations for a new entry or modification of the Annexes;

-        Clarify in annexes the constraints and add comments columns for factual information;

-        Update the main body of the Decision and remove obsolete references;

-        Reference to RED;

-        Consider the need for provisions in the Decision for future instances where multiple new candidate entrants are under consideration;

-        Conditions to delete one system from the Annex 2 of ERC Decision (99)06;

-        Role and list of supporting CEPT administrations to be added in Annex 1 and Annex 2;

-        Link with the notifying administration of the system candidate;

-        What are the national obligations on systems not fulfilling operational conditions that are based on requirement for protection from a limited number of countries.



Deliverable Rev. ECC Decision
Responsible group WG FM - FM44
Start date 04-03-2022
Target date 26-07-2024
Public Consultation 23-02-2024
Permanent Work Item False
Comments Provisions of the revised Decision will be applied to new candidates declared after thepublication of the revised Decision.

Keywords S-PCS, MSS
Worked by FM 44
Contact Peter Faris ([email protected])
Status In Progress
Triggered By ECC #58 (March 2022)

D,F, HRV, HUN, LIT, NOR, POR, RUS, SUI, UK



Progress Report