European Communcations Office

ECC Work Programme Database

   
Work Item details
Reference FM44_44
Short Name Framework for satellite use in the band 40.5-43.5 GHz
ETSI Workitem
ETSI Deliverable
Subject Reflect planned use of the band 40.5-43.5GHz

Related WI PT1_34
PT1_37
PT1_39
PT1_46
Scope

To establish/update the framework for use of FSS earth stations on a coordinated basis in the band 40.5-43.5 GHz, considering:

-       (a) designate the band 40.5-42.5 GHz for coordinated and uncoordinated FSS earth stations (space-to-Earth) (retaining the current condition about uncoordinated earth stations not claiming protection from the fixed and broadcasting services); and (b) add “MFCN” from which uncoordinated earth stations shall not claim protection.       

-       designate the band 42.5-43.5 GHz for coordinated FSS earth stations (Earth-to-space)




Deliverable ECC Decision
Responsible group WG FM - FM44
Start date 04-03-2022
Target date 28-07-2023
Public Consultation 24-02-2023
Permanent Work Item False
Comments WG SE / SE19 has been requested to revise ECC/REC/(01)04 on FS at 40 GHz and to consider the possible withdrawal of the MWS.

WG FM #102 requested an amendment to the deliverables;
Amended ECC Decision (02)04 or possible new ECC Decision


Keywords FSS
Worked by
Contact Peter Faris ([email protected])
Status Finalised
Triggered By Cyprus, France, Germany, Greece, Luxembourg, Norway, Spain, Switzerland
Progress Report ECC #61 (and WG FM #104) revised the work item to account for the their decision to consult on a new ECC Decision (23)01 that intends to replace and withdraw ECC Decision (02)04.

ECC #62 in July 2023 published ECC Decision (23)01 On the use of the band 40.5-42.5 GHz by earth stations in the fixed-satellite service (space-to-Earth) and broadcasting satellite service and on the use of the band 42.5-43.5 GHz by earth stations in the fixed-satellite service (Earth-to-space)

https://docdb.cept.org/document/28598

This WI was therefore finalised following ECC #62.