Reference PT1_SWG_C_20
Short Name PT1_SWG_C_20
ETSI Workitem
ETSI Deliverable
Subject

Suitability of technical conditions of ECC DEC (11) 06 to 5G


Related WI PT1_10
Scope To assess the suitability of the harmonised technical conditions of ECC DEC (11)06, applying to MFCN in the band 3.4-3.8 GHz, to 5G
Deliverable ECC Report
Responsible group ECC PT1 - SWG-C
Start date 17-06-2016
Target date 04-06-2018
Public Consultation
Permanent Work Item False
Comments This study should evaluate the suitability of harmonised technical conditions of ECC DEC(11)06 to 5G and to propose, if needed, follow up action(s)



Keywords 5G, C Band
Worked by
Contact Peter Faris ([email protected])
Status Finalised
Triggered By ECC SG May16

+

ECC#42 June 16