To carry out studies to assess the possibility of land-based in-motion earth stations, including vehicle-mounted earth stations and earth stations on trains operating with GSO FSS systems in the 14 – 14.5 GHz (Earth-to-space) frequency band.
Deliverable: LS to FM44 from WG SE drafted by SE 40 with the outcome of technical studies