European Communcations Office

ECC Work Programme Database

   
Work Item details
Reference SE07_32
Short Name
ETSI Workitem
ETSI Deliverable
Subject Compatibility and technical feasibility of coexistence studies for the potential introduction of new terrestrial applications operating in the
 2 483.5 - 2 500 MHz frequency band with existing services / applications in the same band and adjacent bands.


Related WI FM_53
Scope To investigate the technical feasibility and coexistence for the potential introduction of new terrestrial applications in the 2 483.5 - 2 500 MHz frequency band, sharing with existing radio services / applications in the same band and compatibility with existing services / applications adjacent bands.

Existing use to be considered in the study are in-band Mobile Satellite Services (MSS), in-band MBANS devices, in-band LP-AMI devices, future in-band RNSS, in-band PMSE, radio applications below 2483.5 MHz including licensed and licensed exempt use; radio applications above 2500 MHz (MFCN). Also the impact of spurious emissions should be considered.

Investigations to take into account relevant ECC Reports including 149, 150, 165, 201, 219, CEPT Report 72.




Deliverable ECC Report
Responsible group WG SE - SE7
Start date 20-05-2020
Target date 31-05-2021
Public Consultation
Permanent Work Item False
Comments MSS operators in the band intend to remain operators of satellite-based mobile services.

New terrestrial applications to be considered in the study based on technical descriptions and specifications of new terrestrial applications for 3GPP band 53 (see TR 36.791) noting that the standardization of a new E-UTRA operating band based upon the 11.5 MHz has been approved, facilitating 2.4 GHz LTE ecosystem development.

ECC PT1 may be involved especially with regard to the band above 2500 MHz (impact on MFCN).

SE7 is invited to work in close cooperation with SE40 as appropriate.


Keywords
Worked by
Contact
Status Finalised
Triggered By WG FM
Progress Report