European Communcations Office

ECC Work Programme Database

   
Work Item details
Reference FM56_08
Short Name EC Mandate to CEPT on latest FRMCS evolution in 900 MHz
ETSI Workitem
ETSI Deliverable
Subject Response to the EC Mandate on developing harmonised technical conditions for introducing the latest technology evolution in the future railway mobile communications system (FRMCS) using the 900 MHz frequency band.
Related WI FM56_05
Scope

Develop harmonised technical and operational conditions based on investigations already done in the CEPT to introduce use cases with the latest technology evolution for the 874.4-880 MHz and 919.4-925 MHz frequency bands in the future railway mobile communications system (FRMCS).

The results of the investigations are reflected in Annex 2 of ECC Decision (20)02, as amended on 28 June 2024 (ECC #64).

Deliverable CEPT Report
Responsible group WG FM - FM56
Start date 08-11-2024
Target date 27-06-2025
Public Consultation 28-03-2025
Permanent Work Item False
Comments

Response to the mandate from the EC to CEPT based on investigations already done in CEPT which are reflected by Annex 2 of ECC Decision (20)02, as amended on 28 June 2024.

No new technical study is needed

Keywords FRMCS, RMR
Worked by
Contact Robin Donoghue ([email protected])
Status In Progress
Triggered By Austria, France, Germany, Liechtenstein, Norway, Slovenia, Switzerland
Progress Report