European Communcations Office

ECC Work Programme Database

   
Work Item details
Reference PT1_57
Short Name Studies between MFCN in upper 6 GHz band and incumbents
ETSI Workitem
ETSI Deliverable
Subject Study and assessment of coexistence and compatibility of MFCN in upper 6 GHz band with incumbent spectrum users (supporting Task1 of the EC Mandate)
Related WI PT1_58
Scope
To study and assess compatibility and coexistence scenarios for MFCN with identified relevant (e.g. FSS, FS, EESS (passive), RAS) existing usages in the 6425-7125 MHz frequency band and relevant (e.g. FSS, FS and WAS/RLAN below 6425 MHz) existing usages in adjacent band(s) and their potential evolution. 
For each compatibility/coexistence scenario, the risk of interference, the deployment assumptions of relevant applications and any consequential restrictions in deployment of the MFCN should be identified.  
This Work Item should also consider available conclusions for coexistence with incumbent radiocommunication services, such as the outcomes of the WRC-23 and technical studies performed by the CEPT and the ITU-R.

Deliverable ECC Report
Responsible group ECC PT1 - ECC PT1
Start date 07-03-2025
Target date 06-03-2026
Public Consultation 07-11-2025
Permanent Work Item False
Comments
Keywords Upper 6 GHz, MFCN, RAS, FS, FSS, WAS/RLAN, EESS (passive)
Worked by
Contact Doriana Guiducci ([email protected])
Status In Progress
Triggered By ECC#65
Progress Report