Reference
|
SE45_01
|
Short Name
|
RLAN_6GHz
|
ETSI Workitem
|
|
ETSI Deliverable
|
|
Subject
|
Wireless access systems(including RLAN) in the band 5925-6425 MHz
|
Related WI |
FM57_01 (ex-FM_52)
SE45_02
SE45_05
|
Scope
|
Study the technical feasibility of the introduction of low power wireless access systems (including RLAN) in the band 5925-6425 MHz under a non-protected basis and ensuring certainty of continued operation, development and protection of existing services (FS, FSS) taking into account RR 5.440 and 5.458
|
Deliverable
|
ECC Report
|
Responsible group |
WG SE - SE45
|
Start date
|
01-05-2017
|
Target date
|
01-05-2019
|
Public Consultation
|
|
Permanent Work Item
|
False
|
Comments
|
See document SE(16)59A22 - Annex 22 to the minutes of WG SE#73, April 2016 - for the working document dealing with ‘additional compatibility studies between RLANs and other services in the band 5725-5925 MHz and mitigation techniques related to RLANs compatibility with other services in the bands 5350-5470 MHz and 5725-5925 MHz’.
To note that there have been previous compatibility studies that address RLANs in the 5GHz range (e.g. ECC Report 244)
ECC Report 302 is published.
|
Keywords
|
|
Worked by
|
|
Contact
|
|
Status
|
Finalised
|
Triggered By
|
WG FM
|
Progress Report
|
|
|
|
|