Reference
|
PT1_20
|
Short Name
|
RMR_900_1900
|
ETSI Workitem
|
|
ETSI Deliverable
|
|
Subject
|
Study on coexistence between RMR base stations transmitting and MFCN base stations receiving in the 900 MHz range as well as above 1920 MHz
|
Related WI |
FM56_1
|
Scope
|
Definition of the least restrictive technical conditions required on Railway Mobile Radio (RMR) base stations, while ensuring coexistence between RMR base stations transmitting and MFCN base stations receiving in the 900 MHz range as well as above 1920 MHz.
The work includes, when relevant, assessment of possible improvement of MFCN BS receiver blocking and selectivity, and coordination between MFCN and RMR as a way to enable RMR macro coverage rollout.
|
Deliverable
|
ECC Report , Other
|
Responsible group |
ECC PT1 - ECC PT1
|
Start date
|
06-07-2018
|
Target date
|
01-05-2020
|
Public Consultation
|
|
Permanent Work Item
|
False
|
Comments
|
In line with LS from WG FM
ECC PT1(18)010
ECC Report 318 finalised in July 2020
|
Keywords
|
RMR, MFCN, 900MHz, 1920MHz
|
Worked by
|
|
Contact
|
Mustonen Miia ([email protected])
|
Status
|
Finalised
|
Triggered By
|
LS from WG FM
ECC PT1(18)010
Support by Czech Republic,Belgium, Finland, France, Germany, Portugal
|
Progress Report
|
|
|
|
|