FM57_01 (ex-FM_52)
Last update: 27-10-2018
CEPT Report WAS/RLAN (Wireless access systems including RLAN) in the band 5925-6425 MHz SE45_01
Study the feasibility and identify harmonised technical conditions for Wireless Access Systems including Radio Local Area Networks in the 5925-6425 MHz band for the provision of wireless broadband services

2 CEPT Reports in response to the EC mandate
S: 03-03-2017
T: 03-07-2020
This work should be done in cooperation with relevant standardisation bodies (ETSI, IEEE, 3GPP, …)
In Progress
FM57_02
Last update: 27-09-2018
Rev. ECC Decision Revision of ECC Decision (04)08 on the harmonised use of the 5 GHz frequency bands for the implementation of Wireless Access Systems including Radio Local Area Networks (WAS/RLANs)

FM57 is tasked to revise ECC Decision (04)08 so that the different types of WAS/RLAN installations are distinguished:
-general case (excluding those below)
   -onboard aircraft
   -onboard road vehicles
   -onboard trains

The regulatory conditions shall exclude the use of WAS/RLAN for UAS radiolinks.
S: 27-09-2018
T: 18-09-2020
In Progress
1
* Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meeting earlier for publication.
0 items selected         Remove         See Gantt Chart