European Communcations Office

ECC Work Programme Database

   
Responsible Groupv
Sort By: Records pr. page:  
Reference Deliverable Subject Related Item Scope Start / Target dates Comments Status
FM60_01
Last update: 22-01-2024
ECC Decision , CEPT Report Harmonised technical conditions for the shared use of the 3.8-4.2 GHz frequency band by terrestrial wireless broadband systems providing local-area (i.e. low/medium power) network connectivity (Task 2 of the EC mandate)
PT1_40
PT1_47
FM60_02

Subject to the sharing solutions and the results of Task 1, as appropriate, develop a harmonised frequency arrangement as well as the least restrictive harmonised technical conditions for the shared use of the 3.8-4.2 GHz frequency band by terrestrial wireless broadband systems providing local-area connectivity (i.e. low/medium power). These harmonised technical conditions shall avoid interference, protect relevant incumbent uses within the band and in adjacent bands, and facilitate cross-border coordination.

 

Based on the results of sharing studies within the3.8-4.2 GHz frequency band and coexistence studies with uses in adjacent bands, provide, where necessary, guidance on appropriate receiver characteristics for radio equipment as part of the harmonised technical conditions or/and recommend to ETSI to consider the results of those studies when developing relevant harmonised standards.
S: 07-03-2022
T: 29-11-2024

Protection and future evolution and development of incumbent users, such as earth stations and fixed links

The necessary coexistence studies with applications in adjacent bands, such as MFCN in 3.4-3.8 GHz and radioaltimeters in 4.2-4.4 GHz will be carried out by PT1 and taken into account by WG FM.

PT1 to perform sharing studies and to assist in defining the harmonised technical conditions, possibly a BEM.

Meetings of PT1 and FM60 on this topic should take place in the same week and at the same location

Work Item was formerly known as FM_56.  WG FM #103 in October 2022 created FM60 to develop the response to the EU Mandate.  WG FM #103 tasked the ECO to amend the WI from FM_56 to FM60_01.

ECC #61 amended the Target Date to November 2024.

PC date amended to align with the ECC #64 being held in June 2024.


In Progress
FM60_02
Last update: 23-06-2023
ECC Recommendation Creation of ECC Recommendations to provide national guidance on the shared use of the 3.8-4.2 GHz band for WBB LMP PT1_47
FM60_01

·        National guidance for protection and to enable future evolution and development through coordination between WBB LMP and the following in-band services:

o   FSS

o   FS

·        National planning of WBB LMP networks

S: 16-06-2023
T: 28-02-2025
More than one ECC Recommendation may be required.
In Progress
* Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meeting earlier for publication.
0 items selected         Remove         See Gantt Chart