Rev. ECC Decision Revision of ECC/DEC/(19)02 on PMR/PAMR and ECC/DEC/(16)02 on BB-PPDR, including their extension to 5G/NR

Enable non-AAS 5G/NR in ECC/DEC/(19)02 and ECC/DEC/(16)02.

Align and simplify as appropriate the technical conditions in the two ECC Decisions and take into account the results of the questionnaire on civil PMR/PAMR below 230 MHz.
S: 14-02-2025
T: 30-10-2026

For the 400 MHz range:

·        align and simplify the technical conditions of ECC/DEC/(19)02 and ECC/DEC/(16)02;

·        alignment with 3GPP operating bands for 4G and 5G to be analysed.

In Progress
FM62_03
Last update: 06-03-2026
Rev. ECC Decision Personal Mobile Radio in the 446 MHz SRD band SE07_34
Revise ECC Decision (15)05 to enable 1 W e.r.p. for PMR446 usage
S: 07-06-2024
T: 26-02-2027
Based on the conclusion of ECC Report 369, WG FM agreed to update the ECC Decision (15)05 to enable higher power PMR446 equipment. The Report concludes that current usage of the band indicates that the 446.0-446.2 MHz band has sufficient headroom to support 1 W e.r.p. PMR446 operations and that there is no need for advanced spectrum management technics.
WG FM #109 Porto February 2025 assigned this work item to FM62 on the creation of that new project team. The work item identity was changed from FM_60 to FM62_03.
In Progress
FM62_04
Last update: 19-02-2026
Rev. ECC Recommendation
Revision of ECC Recommendation (16)03 on cross-border coordination for Broadband Public Protection and Disaster Relief (BB-PPDR) systems in the frequency band 698 to 791 MHz
Revision of ECC Recommendation (16)03 to update the technical parameters of non-AAS NR systems
S: 13-02-2026
T: 25-06-2027
In Progress
* Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meeting earlier for publication.