ECC Recommendation New ECC Recommendation to cover all potential FRMCS cross-border variants at 900 MHz, induced by NR channels smaller than 5 MHz FM56_05
Following the inclusion of NR channels smaller than 5 MHz at 900 MHz in ECC Decision (20)02, a new ECC Recommendation is needed to cover all potential RMR cross-border variants at 900 MHz.
S: 07-07-2023
T: 31-10-2025

With respect to any “agreement” or “arrangement” the new ECC Recommendation will copy the format of the text as set out in ECC/REC/(23)01.

The revision of ECC Recommendation (08)02 by PT1 is also needed to withdraw text related to FRMCS.
In Progress
FM56_07
Last update: 24-06-2024
ECC Report Toolbox for an efficient national implementation of ECC Decision (20)02
Development of a new ECC Report providing a toolbox for an efficient national implementation of ECC Decision (20)02
S: 07-06-2024
T: 17-10-2025
Triggered by Austria, France, Germany, Hungary, Liechtenstein, Switzerland
Approved by WG FM #107 June 2024

The intention is not to revise ECC Decision (20)02, but to describe possible measures and procedures for cooperation between administrations, RMR network operators, and MNOs, that minimise the implementation burden for all involved parties.

ECC Reports 162 and 229 can be used as a basis.
In Progress
FM56_08
Last update: 08-11-2024
CEPT Report Response to the EC Mandate on developing harmonised technical conditions for introducing the latest technology evolution in the future railway mobile communications system (FRMCS) using the 900 MHz frequency band. FM56_05

Develop harmonised technical and operational conditions based on investigations already done in the CEPT to introduce use cases with the latest technology evolution for the 874.4-880 MHz and 919.4-925 MHz frequency bands in the future railway mobile communications system (FRMCS).

The results of the investigations are reflected in Annex 2 of ECC Decision (20)02, as amended on 28 June 2024 (ECC #64).
S: 08-11-2024
T: 27-06-2025

Response to the mandate from the EC to CEPT based on investigations already done in CEPT which are reflected by Annex 2 of ECC Decision (20)02, as amended on 28 June 2024.

No new technical study is needed
In Progress
* Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meeting earlier for publication.