European Communcations Office

ECC Work Programme Database

   
Responsible Groupv
Sort By: Records pr. page:  
Reference Deliverable Subject Related Item Scope Start / Target dates Comments Status
123
SE_10
Last update: 23-11-2021
Other

Cooperation with RED-CA and ADCO RED

 

  • Response to requests from RED CA;
  • Guidance on cases where administrations have faced difficulties with opinion from Notified Bodies.
Permanent Work item
Cooperation planned with RED CA and ADCO RED
In Progress
SE_12
Last update: 10-10-2022
Other Sat MoU: Request Leeheim measurements in accordance with the Decide 5 and 3 of ECC/DEC/(09)02
Report to WGFM/FM44 of the result of the measurement so that the ITU-R can be notified about possible interferences
Permanent Work item
The specification of Iridium interference measurement in the band 1610.6-1613.8 MHz has been provided to the SAT-MoU. Leeheim station has provided the cost estimation.
Information on Sat MoU available at http://www.cept.org/eco/groups/eco/sat-mou  

The measurements are expected to start in end of 2022.



In Progress
SE07_34
Last update: 26-09-2024
ECC Report Private Mobile Radio in the 446-446.2 MHz frequency band  FM_60
To perform the relevant studies for PMR446 evolution on the increased power up to 1 W e.r.p., including impact on PMR446 ecosystem as a whole and continued coexistence between PMR446 users.
S: 27-09-2024
T: 31-01-2026
It is of particular interest to WG FM how the overall capacity of PMR446 in a given area may change.
In Progress
SE19_24
Last update: 11-05-2017
Other Coordinated inputs to ITU-R WP5C
Coordination of contributions related to FS channel arrangements to ITU-R F series recommendations

Deliverable: Coordinated inputs to ITU-R WP5C

Permanent Work item
In Progress
SE19_43
Last update: 09-05-2024
ECC Report To derive a methodology for protection criteria for FS except long term SE19_49

To derive a general methodology for “short term” criteria for Fixed service and evaluate the relationship between "long term" and "shortterm" protection criteria and FDP (Fractional Degradation of Performance).

S: 02-10-2019
T: 31-05-2025

The report should provide general guidance / methodology on how to derive appropriate “short term” protection criteria for FS for any sharing and compatibility studies involving FS.

This report is expected to include following;

  • Evaluation of generic objective in absence of detailed information on power distribution of the interferer.
  • Demonstration of the application of this methodology by giving some examples for “short term”criteria for different FS bands.
  • Evaluation of the impact of different parameters (e.g. ATPC, rain or multipath fading,error performance and availability objectives) on “short term” criteria and FDP.
In Progress
SE19_47
Last update: 09-05-2024
ECC Report Representative FS parameters for sharing and compatibility studies
To collect up to date technical FS parameters from CEPT countries and compile thereof a set of representative technical FS parameters for each FS band to be used in sharing and compatibility studies.
S: 11-01-2021
T: 31-05-2025
The data should be collected by questionnaire developed SE19 and launched by WG SE
Parameters should be delivered to ITU-R WP5C as representative technical parameters to be considered for inclusion in ITU-R F. series deliverables (e.g. REC ITU-R F.758 and F.2086)
The ECC Report may be updated on an appropriate regular basis.

In Progress
SE19_48
Last update: 09-05-2024
Rev. ECC Recommendation
Revision of ECC/ ERC Recommendations related to FS.

Possible revision of ECC/ ERC Recommendations related to FS, if appropriate.

S: 03-02-2023
T: 30-09-2025
In Progress
SE19_49
Last update: 09-05-2024
ECC Report Evaluation of the usage of Adaptive Coding and Modulation (ACM) mechanism in fixed links in CEPT and of the impact of interference on that mechanism as well as the resulting challenges for FS operation. SE19_43
SE24_47
Evaluation of the usage of Adaptive Coding and Modulation (ACM) mechanism in fixed links in CEPT. This includes the reference modulation and the impact of time varying interference either continuous or of pulse/ burst nature, on Adaptive Coding and Modulation (ACM) mechanism and resulting challenges for the operation of FS. This report is expected to include information on the following elements 

General aspects
  • Description of the ACM principle 
  • Performances of ACM, e.g time of reaction and thresholds (based on the propagation physics and on data from manufacturers)
  • Strategy of implementation for ACM in relation with/without ATPC (based on data from manufacturers)
  • Use of ACM for fixed links in CEPT administrations
  • Reference modulation(s) in the list of modulations, relation with NFM / FM and planning operations
  • Impact of interference (either continuous or pulse/ burst nature) on Band and Carrier Aggregation (BCA) systems with ACM
  • Impact of interference (either continuous or pulse/ burst nature) on ACM performance
  • Impact of propagation effects in the different FS frequency bands on ACM 
  • Impact of the findings on WI43 and WI47
  • Impact within a network and on third party links of considering protection levels up to ACM modulation versus the reference modulation only
  • Operator's needs in terms of ACM links usage and performance in the network and impact on their network if ACM proper operation cannot be relied
  • Mitigation techniques
S: 01-05-2024
T: 30-09-2025
In Progress
SE21_09
Last update: 04-11-2024
Other Coordinated inputs to ITU-R: WP1A and other relevant ITU-R groups (in particular WP 5B) on unwanted emission issues
Coordination of contributions related to unwanted emission issues to ITU-R WP 1A and other relevant ITU-R groups (in particular WP 5B).

Deliverable: Coordinated contribution to ITU-R WP1A
Permanent Work item
In Progress
SE21_22
Last update: 04-11-2024
Rev. ECC Report Revision of ECC Report 249 SE21_26
To update ECC Report 249 “Unwanted emissions of common radio systems: measurements and use in sharing/compatibility studies ” with new material
S: 25-01-2019
T: 30-09-2026

To collect and review measurements in particular for 5G BS and UE measurements

To review as appropriate, the existing parameters with up to date measurements if available and to complete with additional systems if possible

To investigate how aggregated spurious emissions should be addressed in sharing and compatibility studies.

To investigate deriving emission masks or statistical distributions (e.g. in both cases based on measurements representing typical performance of equipment) for use in sharing and compatibility studies.

The result of this  work item should be considered when determining whether a revision of ECC Rec (19)02 is required.

Noting that the ECC Report 249 was updated during the 90th WG SE meeting in January 2022, the WI would continue to address 5G AAS measurements while keeping the available material as the baseline for the further work.

SE21 would also consider how the revision history of the ECC Report 249 could be addressed.
In Progress
123
* Target dates are seen as the intended date for the final approval of the related deliverable by the responsible entity. Internal deadlines for project teams and dates for the start of Public Consultations can be reflected in the remarks column. In general this implies that the draft deliverable should be completed by the project team one WG meeting earlier for publication.
0 items selected         Remove         See Gantt Chart