|
EFIS/MG_04
Last update: 27-10-2018
|
Other
|
EFIS Software Developments
|
|
To develop EFIS further to fulfil the requirements set out in respect of the ECC's strategic plan, spectrum inventory and EC Decision for EFIS
|
|
WGFM instructs ECO to conduct software changes in the EFIS DB.
WGFM#92 (September 2018): new action list endorsed. The summary of the EFIS questionnaire was also endorsed.
ECC#49 (October 2018): the meeting welcomed new developments on an Application Programming Interface (API) and is looking forward for the further steps of the API implementation.
|
In Progress
|
|
|
EFIS/MG_05
Last update: 12-10-2021
|
ECC Decision
|
Update ECC/DEC/(01)03
|
|
Update of list of EFIS application terms.
|
|
|
In Progress
|
|
|
EFIS/MG_07
Last update: 03-10-2018
|
Other
|
RIS Model Validation
|
|
EFIS/MG to validate RIS Models from originating PTs/MGs concerning compliance with the RIS Model template guidance and compatiblity with the EFIS DB.
|
|
|
In Progress
|
|
|
EFIS/MG_11
Last update: 30-10-2020
|
Other
|
Supervise ECO Report 04
|
|
ECO Report 04 - FS implementation in Europe
WGFM #97 in October 2020 decided to remove ECO Report 05 from the scope of this Work Item
ECO Report 05 on 'CEPT, ECC and ECdeliverables - relation to application terminology specified in ECC Decision(01)03 Annex 2'
|
|
An update was endorsed by WGFM#91 in May 2018
|
In Progress
|
|
|
FM RA FG_01
Last update: 12-10-2021
|
ECC Recommendation
|
T/R 61-01 (CEPT Radio Amateur Licence), T/R 61-02(HAREC) and ECC/REC/(05)06 (CEPT Novice Radio Amateur Licence).
|
|
Maintenance of T/R 61-01, T/R 61-02 and ECC/REC/(05)06 as well as update of the FAQs file (placed on the RAFG webpage) on the interpretation of these Recommendations by the ECO.
|
|
ECO is updating national information in T/R 61-01, T/R61-02 and ECC/REC/(05)06 from CEPT countries on request.
|
In Progress
|
|
|
FM_01
Last update: 23-11-2021
|
Rev. ECC Report
|
European Common Allocation Table (ERC Report 25)
|
|
Update of ERC Report 25 (European Common Allocation Table)
|
|
WG FM#100 (October 2021) approved the revised ERC Report 25 (European Common Allocation Table) for publication.
|
In Progress
|
|
|
FM_02
Last update: 12-10-2021
|
Other
|
Civil/Military Forum
|
|
Development of Civil/Military frequency harmonisation
|
|
An overview on the civil-military meeting (23-24 November 2016 in Prague) and the results based on the presentation which was produced as the “outcome document” is in doc. FM(17)005-Annex 05.
WGFM#88 decided to keep the working methods for the Civ/Mil meeting (last revision 2010, see doc. FM(17)005-Annex 4), only subject to possible editorial amendments.
The next Civil-Military Meeting will take place 31 May - 1 June 2022 in Amsterdam at the kind invitation of the Netherlands.
|
In Progress
|
|
|
FM_04
Last update: 12-10-2021
|
Other
|
General review of all ECC/ERC Decisions and Recommendations >5 years old
|
|
Proposals for Decisions and Recommendations to be revised/retained/abrogated as appropriate
|
|
WG FM #99, June 2021 approved the editorial update of;-
- ECC Decision (19)04 on Airborne earth stations, 12.75 - 13.25 GHz.
ECC in March 2021 published;-
- the revision of ECC Decision (08)01 on ITS at 5.9 GHz.
|
In Progress
|
|
|
FM_57
Last update: 24-06-2024
|
Other
|
Low Frequency MicroWave Security Scanners (MWSSc) operating in 3.6-10.6 GHz range using UWB technology
|
SE24_76
|
Scope out studies on the compatibility and technical feasibility of coexistence for the potential introduction of MWSSc based on UWB in the band 3.6 to 10.6 GHz with existing radio services in the frequency range and adjacent bands.
|
S: 10-06-2022
T: 31-10-2025
|
Fixed indoor and temporary fixed outdoor use of MWSSc based on UWB in the band 3.6 to 10.6 GHz will be considered.
WG SE is asked to check if limiting outdoor use to entrance of a building can have an influence in the different parts of3.6-10.6 GHz
Based on the technical studies from WG SE, WG FM will decide what type of deliverable (if any) would be suitable.
|
In Progress
|
|
|
FM_60
Last update: 24-06-2024
|
Other
|
Personal
Mobile Radio in the 446 MHz SRD band
|
SE07_34
|
Scope
out studies on the compatibility and technical and practical feasibility of increasing
power to 1 W e.r.p., including impact on PMR446 usage between users
|
S: 07-06-2024
T: 27-02-2026
|
Triggered by France,
Lithuania, Luxembourg, Romania, Slovak Republic, Spain
Approved by WG FM #107 June 2024
There is no direct adjacent application nor
service, so WG SE is asked to check the PMR446 ecosystem as a whole, ensure a
proper coexistence between PMR446 users.
Once the technical studies from WG SE are
completed, WG FM will evaluate advantages and disadvantages of updating ECC
Decision (15)05.
|
In Progress
|
|